Get A Quick Quote

Name *

E-mail *

Company Name *

Country / Region *

Product Interested In *

Light-Duty Helical Piles

Standard Helical Piles

Custom Helical Piles

Accessories

Estimated Quantity

Upload Drawing / File

Phone / WhatsApp

Message / Project Details*

Thank you for your inquiry. Our sales engineer will review your request and contact you as soon as possible.

Technical Resources

Product information, installation guidance and technical references for helical piles and accessories.

Materials & Standards

A helical pile specification needs more than a shaft diameter and a steel grade. Material form, wall thickness, helix geometry, welding, connections, protective finish and inspection requirements all affect the finished product.

SSP manufactures helical piles and foundation components in China, with Canadian engineering support for product and project review. We work from agreed drawings and specifications and help customers identify the manufacturing documents needed for their project.

Steel Grades Used by SSP

Our commonly used materials include Q235B, Q355B and Q460-series steels. The selected grade and quality designation depend on the component, approved design and material availability.

Q355B is used in a number of our pile and component specifications. Higher-strength material may be proposed for particular components where the design requires it. The shaft and helices do not necessarily use the same grade, so each component should be identified separately on the approved drawing or bill of materials.

Actual supplied material must be identified by its product specification and supporting mill documentation. Grade names alone do not establish the condition or performance of the finished assembly.

Material Comparison Is More Than Matching Strength

When a project specifies an EN, ASTM, CSA or AS/NZS material, we review the requirements before proposing a Chinese-grade alternative.

A material comparison should address:

  • Product form and manufacturing route, such as plate, pipe or structural hollow section.
  • Thickness range and dimensional tolerances.
  • Chemical composition and carbon equivalent where required.
  • Yield and tensile strength, elongation and test conditions.
  • Impact toughness, test temperature and delivery condition.
  • Weldability, testing requirements and material traceability.

Q355B must not be described as automatically equivalent to S355J2H, ASTM A252 Grade 3 or an Australian G350/C350 material. Similar nominal strength does not establish compliance with another product standard or its toughness and manufacturing requirements.

For example, a specification for S355J2H structural hollow sections includes requirements that cannot be demonstrated simply by quoting the number 355. The applicable hollow-section standard, material condition and test evidence must also be checked.

Any proposed substitution requires the project engineer's or other authorised party's written acceptance before manufacture. A material-comparison statement supports that review; it is not a replacement for batch-specific evidence.

Helix Forming and Fabrication

Our manufacturing work includes steel-pipe processing, helix forming, welding and assembly of pile components. Helix diameter, thickness, pitch and orientation are controlled against the approved drawing.

Connection details, hole positions and fit need to be checked as part of the assembly. Changes to shaft size, helix geometry or coupling details must be reviewed before they are introduced into production.

Welding Process and Inspection

SSP uses GMAW/MAG welding for relevant fabricated components. Welding parameters, consumables, joint preparation, preheat where required and welding sequence should follow the applicable welding procedure.

Inspection requirements are agreed for the product and order. These may include dimensional checks, visual weld inspection and specified non-destructive testing. The required test method, extent, acceptance criteria and records should be defined before production.

Where a project specifies a particular welding standard, such as AS/NZS 1554.1, its procedure, personnel and inspection requirements must be addressed for that project. A welding-company certificate should not be treated as automatic compliance with every international welding specification.

Galvanizing Requirements

Hot-dip galvanizing after fabrication is our normal protective finish. Our normal average coating-thickness target is at least 85 μm, with the final inspection and acceptance criteria defined by the order and applicable standard.

The coating specification should identify relevant component categories, local and average thickness requirements, sampling and permitted repair methods. Additional finishing requirements should be submitted during the enquiry stage.

Certificates and Project Documents Have Different Roles

ISO 9001 concerns a quality-management system. CWB company certification concerns welding operations within its certified scope. CE-related documentation applies to the products and technical basis identified in the relevant documents.

Please request the current documents relevant to your proposed supply. The legal entity, manufacturing location, scope and validity must match the order requirements. None of these documents, by itself, establishes site-specific foundation capacity or replaces local design approval.

Agree the Documentation Before Production

Depending on the order and agreed scope, SSP can provide or coordinate relevant documentation such as:

  • Approved manufacturing drawings and revision records.
  • Mill test certificates and material identification or traceability records.
  • Applicable welding procedures, qualification records and inspection reports.
  • Coating inspection records and agreed test results.
  • Relevant certificates and product documentation for review.
  • Packing lists, component identification and shipment inspection records.

Please identify mandatory documents, third-party inspection and witness points with your enquiry. Their availability, scope, timing and any additional cost can then be confirmed before the order is placed.

Engineering Support and Local Approval

SSP can assist with preliminary calculations, pile selection, connection details and manufacturing review. Unless a separate local professional appointment is expressly agreed, our support does not replace the project's locally registered engineer or Engineer of Record.

Send your drawings and specification so that we can review the required material, fabrication and documentation package with your team.

Request a Manufacturing Specification Review

+86 186 1097 9052

ryanzhang@ssppile.com